Thursday, 15 November 2012

Today we went to the studio we had originaly booked for the 14th. The studio was located in Harlow, in the town centre just 10 minutes from school. We had to take our props from school which consisted of the camera and the tripod. We also brought other props such as a guitar to use in our filming. This was because we had researched Ed Sheeran around a month ago and had seen that he plays an acoustic guitar so by having one, it was more realistic and also looked good at the same time. The main point of the location was to get all of our choruses done. This was a running theme we wanted in the video of keeping the location the same throughout which meant we had to do it at the same time. When we arrived we went into the studio and played around with the lighting. We also found that some props were useful such as the seats we used which gave it more of an effect. We filmed all 3 parts of the chorus for our song whilst also taking the other shots we wanted to take as you can see from our shot schedule a few days ago. Looking back after on the camera we were satisfied with our shots and filming and began to take some pictures of the people we used in the film, Darren and Lauren. We took these began we need photos for our webiste and our digipak and decided that as a group we would use the same photos to keep continuity between us. Here are some shots of our location and the props we used today:

Here is the location and the lighting that we used.

 Here are some of the props we have used in this particular filming sequence.

Here are the people involved with the props they used.

No comments:

Post a Comment